System Testing and Start-up Services
Testing and Start-up Activities
Testing standards development
Testing procedure development
Design review and comment
Field test package development
Scheduling and planning
Operational procedure development and revision
Vendor coordination
Construction coordination
Analog loop testing
Digital loop testing
Instrumentation calibration
Control schematic checkout
Control, medium and high voltage switchgear and breaker checkout
Component and system functional testing
Integrated system testing
Control logic testing
Equipment problem troubleshooting
Construction completion records (i.e. drawings, test records and documents)
Operational support as required
Factory acceptance testing (FAT)
Typical Equipment Tested
Coal trippers pulverizers and dumpers
Soot blowers, water lances, water cannons and precipitators
Conveyors and material handling equipment
480 Volt, 6.9 KV and 4.16 KV switchgear
Primary, induced draft and forced draft air fans
Selective catalytic reduction equipment
Chemical reactors, mix tanks, complete wet and dry transfer systems
Blending, pasteurization and filling equipment
HVAC, dust handling and air monitoring equipment
Pharmaceutical manufacturing and packaging equipment
Automated process control systems (PCS)